Manufacturing

Every certificate is assembled by hand from data you already have.

The packing list, the QC form and the specification library all exist. Your quality manager joins them by hand, and a wrong revision letter costs a shipment.

Where it starts

A packing list, a QC form, a specification library, the customer’s template, an email asking where it is.

Where it starts Packing list QC form Spec library Customer template “Where is it?” 20 hoursper batch, one manager YOUR QUALITY MANAGER What the client gets CoC-batch-2041-FINAL.pdfAssembled by hand.Wrong revision, lost shipment.
Where it starts Packing list QC form Spec library Customer template “Where is it?” 20 hoursper batch, one managerYOUR QUALITY MANAGER What the client gets CoC-batch-2041-FINAL.pdfAssembled by hand.Wrong revision, lost shipment.
When the customer questions a value, the answer is a search through folders.

The first artifacts

Your quality manager describes the certificate once.

YOUR QUALITY MANAGER no code needed “This is how we buildthe certificate.” CERTIFICATE OF CONFORMANCE SUBMIT no signal needed BATCHES THIS WEEK TARGET SPECIFICATION LIMITS Thickness · in limit Batch matches test file Wrong revision · blocked they sign in themselves
YOUR QUALITY MANAGER no code needed “This is how we buildthe certificate.” CERTIFICATE OF CONFORMANCE SUBMIT no signal needed BATCHES THIS WEEK TARGET SPECIFICATION LIMITS Thickness · in limit Batch matches test file Wrong revision · blocked they sign in themselves
EVERY FIELD, ITS SOURCE 0.044 in QC FORM · AVERAGE20,000 PC PACKING LIST · BATCHSPEC 2041 · B SPEC LIBRARY · REV B
EVERY FIELD, ITS SOURCE 0.044 in QC FORM · AVERAGE20,000 PC PACKING LIST · BATCHSPEC 2041 · B SPEC LIBRARY · REV B
IT REFUSES TO PRINT Batch matches its test fileEvery value inside the limitWrong test file · blocked
IT REFUSES TO PRINT Batch matches its test fileEvery value inside the limitWrong test file · blocked
  • 01

    The certificate, built from the three documents it already depends on

  • 02

    Every value against its specification limit

  • 03

    A batch that does not match its test file is blocked

  • 04

    Every field carries its source, down to the row

The case

Certificate reporting

Capability

Certificates of conformance built from the packing list, the QC form and the specification library. Nobody retypes a number, and the document refuses to print when a check fails.

Capability · not live

The impact

What it changes for you.

2 DAYS MINUTES Days tominutes Fullvisibility First in yourindustry Agents thatactually work An asset thatcompounds
2 DAYS MINUTES Days tominutes Fullvisibility First in yourindustry Agents thatactually work An asset thatcompounds

Next

Connect us with one of your experts.

Your people keep the judgment. Lucum turns their rules and exceptions into a tool the company owns.